Construction of a new silo-line for semolina with innovative solutions for transporting and dosing of the products for the pasta factory

611 3 Aussenansicht fertig

  • 17 round cells with a capacity of 50-150 m³ each
  • Tank lorry loading section with sieving system
  • Special screw out-feeder into 5 pasta lines out of every cell
  • Suction pneumatic with 5 feeding stations per transport line
  • Control sieving station, grinding of pasta breakage, central vacuum cleaning system
  • Complete electrical and control panel system

AussenansichtImBauAustragungSchaltwarte

SchleusenSilodecke