Projects

Construction of a loading system for malt with new engine house and perception hall

613 4 Siloturm Avangarde

  • Connection with the existing part
  • 100 t/h filling capacity
  • 6 cells with 65 m³ each
  • 1 dryer
  • 150 t/h loading capacity

Skizze